SimpleFunctions

U.S. private data center construction spending for July 2026 above $77.5B

Above $77.5B is priced at 4¢ on Kalshi. Current book: 3¢ bid, 7¢ ask, 4¢ spread. This outcome ranks #6 of 7 inside Will U.S. private data center construction spending for July 2026 be above $.

Price history

4¢ current

11¢
0¢10¢
Aug 14, 2026Aug 20, 2026

Contract brief

If the U.S. Census Bureau reports that U.S. private data center construction spending for July 2026 is above $77.5B (billion) at a seasonally adjusted annual rate, then the market resolves to Yes.

Outcome

Above $77.5B

Rank

#6 of 7

Leader

Above $65.0B 92¢

Range

1¢-92¢

Family volume

$107

Identifier

KXDATACENTCON-26SEP01-T77.5

Aug 22, 2026, 11:08 PM UTC · 3m ago

Implied probability

4¢
Latest venue quote
Aug 22, 2026, 11:08 PM UTC · 3m ago

Bid

Ask

Spread

Reported volume

$3K

Family rank

#6 of 7

7 outcomes · Will U.S. private data center construction spending for July 2026 be above $

Closes

Sep 1, 2026

Family volume

$107

Orderbook snapshot

3 / 7¢

Kalshi
4¢ spread
BidSize
3¢200
AskSize
7¢25
8¢50
11¢400
29¢50
43¢170

Contract terms

What resolves this market.

YES condition

If the U.S. Census Bureau reports that U.S. private data center construction spending for July 2026 is above $77.5B (billion) at a seasonally adjusted annual rate, then the market resolves to Yes.

Venue

Kalshi

Closes

Sep 1, 2026

Identifier

KXDATACENTCON-26SEP01-T77.5

SF Signal
SF Index
50000.00
Regime
neutral

Event family

Will U.S. private data center construction spending for July 2026 be above $.

The same race as a probability stack: rank, volume, and where this contract sits against the other outcomes.

Total volume

$107

Outcomes

7

Highest price

Above $65.0B 92¢

Current share

0%

Indicators

Yield, cliff risk, volatility, and regime.

IY (Yes)

>100,000%

IY (No)

117.4%

Adj IY

50000%

CRI

32

Overround

1.6%

Regime

neutral

Score

0.5

Full indicator table

>100,000%
117.4%
Adj IY
50000%
32
Overround
1.6%

Odds pages

Related prediction questions

Browse odds

Related readings

Matched from SimpleFunctions blog, opinions, technical guides, concepts, and learn pages.

Browse library
Technicalguide

Kalshi vs Polymarket: A Developer's Comparison of APIs, Orderbooks, and Liquidity

Data-driven comparison of Kalshi and Polymarket APIs, orderbooks, rate limits, and liquidity. Code examples for building on both prediction markets.

Blogmarkets

Kalshi vs Polymarket: Which Prediction Market Should You Trade?

In-depth comparison of Kalshi and Polymarket for prediction market traders. Regulatory structure, liquidity, fees, API tooling, and cross-venue trading with SimpleFunctions.

Opinioncomparison

Kalshi vs Polymarket: Mechanics, Fees, Regulation, Liquidity (2026)

Side-by-side comparison of Kalshi and Polymarket in 2026. Fee math, calibration data, withdrawal speed, and a decision tree for picking the right venue.

Blogmarkets

Prediction Market Orderbook Analysis: Reading Depth, Spread, and Liquidity

How to read prediction market orderbooks. Binary settlement, spread-as-percentage, depth asymmetry, executable edge calculation, and cross-venue arbitrage analysis.

Opinionanalysis

Liquidity Availability Is the Real Edge in Prediction Markets

Implied yield, cliff risk, and overround all describe what to trade. Liquidity Availability Score describes whether the orderbook can absorb the trade. Why LAS is the indicator that decides who actually books P&L.

Opinionanalysis

Implied Yield vs Raw Probability: Why Bond-Adjacent Prediction Markets Need a Different Lens

Why fixed-income-adjacent prediction-market contracts need to be priced in implied yield, not raw probability, with two real Kalshi Fed-decision contracts as a case study.

SimpleFunctions context

Index, screen, query, and monitor.

Open index

How we compute these odds

SimpleFunctions aggregates live prediction-market contracts from Kalshi and Polymarket. Each slug groups contracts that resolve on the same underlying event, identified by venue event_id.

For binary slugs, the headline probability is the liquidity-weighted mid-price across all bound contracts. For multi-outcome slugs (e.g. elections with 3+ candidates), the headline is the leader’s price; we never arithmetically average disjoint outcomes — that would produce a number with no real-world meaning.

Snapshots refresh every 5 minutes during market hours; daily aggregates are computed at 04:00 UTC. The 30-day sparkline is drawn from per-ticker daily means stored in market_indicator_daily; 24h delta and movement events are derived from the same source.